Jacuzzi BY82000 User Manual

Browse online or download User Manual for Sanitary ware Jacuzzi BY82000. Jacuzzi BY82000 User's Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - ONE WALL

SUMMER RAIN™ II2 PERSON SHOWER SYSTEMONE WALLINSTALLATION AND OPERATING INSTRUCTIONS Jacuzzi Whirlpool Bath© BY82000 03/05

Page 2 - IMPORTANT SAFETY INFORMATION

TOWERS AND DOORS INSTALLATIONTHESE INSTRUCTIONS ARE FOR SUMMER RAINUNITS WITH AND WITHOUT AIR FEATURE OPTION.REFER TO COMPONENT IDENTIFICATION ON PAG

Page 3 - CONTENTS

TOWERS AND DOORS INSTALLATIONSTEP 4Take the side support rails and install a cover cap and wall bracket on each end. Place the center support rail i

Page 4 - SPECIFICATIONS

TOWERS AND DOORS INSTALLATIONSTEP 5Two shut-off valves are provided per water tower. Tohook up supply lines, unscrew valves from braided line.Using

Page 5 - FRONT VIEW SIDE VIEW

TOWERS AND DOORS INSTALLATIONSTEP 6Move the door assembly to the door post on water towerand slide the assembly into the door post. Locate thebase o

Page 6

TOWERS AND DOORS INSTALLATIONFINISH WALLEDGEOF BASEGLASS SIDEPANEL MOUNTEDPARALLEL TO EDGE OF BASEWALL POSTTAPE (3)SCREWS (3)STEP 9Position the fixed

Page 7 - DETAIL 1

TOWER AND DOOR INSTALLATIONSTEP 12Align the glass with glass jamb and insert. RepeatSTEPS 8 through STEP 10 for the other fixed glasspanel.WALL POSTG

Page 8 - INCORRECT

STEP 16Install handles as shown. Note orientation of handle.Hand tighten knob. Flat screw has a screw driver notch.Do not over tighten either knob o

Page 9

TOWERS AND DOOR INSTALLATIONAPPLY SEALANT ALONG BASE ANDSIDE OF WALL POST AND GLASS ANDWALL POST (BOTH SIDES)APPLY SEALANTALONG BASEOF FIXED GLASS(BO

Page 10 - * ONLY WITH AIR TOWER UNITS

OPERATIONSHOWER TOWERS16Jacuzzi Whirlpool Bath© BY82000 03/05Shower HeadThere are three selectable positions: Jet, Normal Pul-sating, and Aerated

Page 11 - DETAIL A

OPERATIONCONTROLLERTo turn ON press ON/OFF button or turn ON water at either shower tower.The unit will then automatically go into a preheat cycle to

Page 12 - BY82000 03/05

Note: This is a professional grade product. A knowledge of construction techniques, plumbing and electricalinstallation according to codes are requi

Page 13 - SHOWER BASE

To remove any lime scale from the shower head and body sprays, rub with your finger the outer ring of nozzles on theshower head and all nozzles on the

Page 14 - WALL POST

TOWER FIXTURES REPAIR PARTS19Jacuzzi Whirlpool Bath© BY82000 03/05TOWER ASSEMBLYWASHER (PART OF D709827)469 (5X)1011 (4X)131415161718193 (5X)2

Page 15 - TOWER AND DOOR INSTALLATION

TOWER PLUMBING REPAIR PARTS11145471061412135416112823233171591819181818ITEMNO. QTY. PART NO. DESCRIPTION1 1 Y221000 TOWER, 2 PERSON SHOWER2 3 U401000

Page 16 - COVER CAP

21Jacuzzi Whirlpool Bath© BY82000 03/05

Page 17 - TOWERS AND DOOR INSTALLATION

Printed in U.S.A. Jacuzzi Whirlpool Bath© BY82000 03/05Printed on Recycled PaperJacuzzi Whirlpool Bath National HeadquartersP.O. Box 702168, Dall

Page 18 - SHOWER TOWERS

Jacuzzi Whirlpool BathP.O. Box 702168Dallas, TX 75370-2168WARRANTY COVERAGEJacuzzi Whirlpool Bath (the “Company”) offers the following express limited

Page 19 - AIR TOWER

RESPONSIBILITIES OF OTHERSInspecting the unit prior to installation is the responsibility of the installer or building contractor who acts on behalf o

Page 20 - MAINTENANCE

CONTENTSSpecifications _________________________________________________________________________ 2Enclosure Specifications ___________________________

Page 21 - TOWER FIXTURES REPAIR PARTS

Important: Read complete instructions before beginning installation.Each unit arrives ready for installation, equipped with base, glass and associate

Page 22 - TOWER PLUMBING REPAIR PARTS

ROUGH-IN REFERENCEENCLOSURE SPECIFICATIONS48"27-11/16"TOP VIEW72"38-15/16"36"1" TILE FLANGEBLOWER MOTOR FOR UNITS WITH A

Page 23 - BY82000 03/05

COMPONENT IDENTIFICATIONFRONT VIEW SIDE VIEWGLASS SIDE PANELGLASS DOORSRAIL BRACKET AND COVER CAPSIDE SUPPORT RAILCENTER SUPPORT RAILAIR TOWERWATER T

Page 24 - Printed on Recycled Pape

PRELIMINARY ROUGH-INThe floor structure beneath the unit must be able tosupport a total weight of the unit and bather. Referto page 2, SPECIFICATIONS

Page 25

STEP 6With a large screwdriver and the tool included with thedrain, tighten the inside compression nut to seal thedrain pipe connection. After drain

Page 26 - WARRANTY SERVICE

STEP 7Place cement board or equivalent on top of showerbase flange and secure to studwall.Apply tile (or other finishing material) leaving a 1/8"

Comments to this Manuals

No comments