SUMMER RAIN™2 WALL & 3 WALLWALK-IN SHOWER SYSTEMSINSTALLATION AND OPERATING INSTRUCTIONS
8STEP 1Position the wall posts so the edge of the post is set back3/4" (19 mm) in from the edge of the baseSTEP 2Level both wall posts in their p
STEP 5Place the tower onto base. Ensure the curved glasslocates into the glazing channel. Install bolt but do nottighten.STEP 6Insert tower support
STEP 11Secure the rails.10ATTACH RAILBRACKET TO WALLSECURE RAIL TOBRACKET (TURN CWTO TIGHTEN)MOVE COVER CAPOVER BRACKETSTEP 9Place the front rail and
112 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATIONSTEP 13AInsert fixed glass support rail into panel post and tightenset screw.GLASS PANELSUPP
2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATIONTOWER COVERINSERT THIS SIDE FIRSTTOWER COVERTOWER TOP PLATE12STEP 16Turn on water supply and c
13Important: Read complete instructions before beginning installation.Each unit arrives ready for installation, equipped with base, glass and associa
3 WALL ROUGH-IN REFERENCE60"42-5/16"33-3/4"27-15/16"84"23"21-1/2"FRONT VIEWTOP VIEW1/2" RIGIDCOPPER PIPEUNDER
3 WALL COMPONENT IDENTIFICATIONHEX WRENCH (1)(PROVIDED)MOUNTINGPOSTCAP3 SCREWS AND3 WALL ANCHORSCURVEDGLASSWALLMOUNTINGPOSTTOWER WITH PLUMBING,FIXTURE
3 WALL BASE INSTALLATIONThe floor structure beneath the unit must be able tosupport a total weight of the unit and bather. Referto the table under to
3 WALL BASE INSTALLATIONSTEP 5With a large screwdriver and the tool included with thedrain, tighten the inside compression nut to seal thedrain pipe c
Note: This is a professional grade product. A knowledge of construction techniques, plumbing and electricalinstallation according to codes are requi
STEP 7With a large screwdriver and the tool included with thedrain, tighten the inside compression nut to seal thedrain pipe connection. After drain
3 WALL: TOWER AND CURVED GLASS INSTALLATIONSTEP 1Position the wall post so the edge of the post is set back3/4" (19 mm) in from the finish wall.
3 WALL: TOWER AND CURVED GLASS INSTALLATIONSTEP 5Insert support rails into brackets in top moulding of towerbut do not tighten at this time.STEP 6Sli
3 WALL: TOWER AND CURVED GLASS INSTALLATIONSTEP 9Secure the rails.STEP 10Tighten the tower base bolt. Two shut-off valves areprovided. To hook up s
STEP 13Turn on water supply and check for leaks. Correct anyleaks before installing tower cover.STEP 14Install tower cover as shown. Insert cover at
2 & 3 WALL OPERATION23STOP RELEASETemperature ValveThe temperature of the mixed water is adjusted by means of thegraduated handle. This handle ha
242 & 3 WALL MAINTENANCETo remove any lime scale from the shower head and body sprays , rub with your finger the outer ring of nozzles onthe showe
TOWER FIXTURES REPAIR PARTS1. C546000 Lock Nut, 1/2" NPT WP (5X)2. G559000 Ring Compression SS (5X)3. G560000 Washer Rubber (5X)4. U54600
TOWER PLUMBING REPAIR PARTS1. A944000 (9X) Spring Clamp, .625 OD Hose2. U405000 L=31.0" Tubing, PVC Reinforced, 10mm Barb3. U405000 L=5.5&q
12345 (2X)6 (2X)7 (6X)8910111213 (6X)15171618202114 (6X)1. U134827 Rail Back Walk-in2. U133827 Rail 2 Wall Walk-in3. U245827 Rail Assembly Wa
Owner's RecordSave These Instructions for Future Use.Date Purchased ____________________________________________________________Purchased From __
3 WALL UNIT REPAIR PARTS1. U134827 Rail Back Walk-in 3 Wall2. U245827 Rail Assembly Walk-in 3 Wall3. U149000 Bracket, Mounting Rail4. U119
Jacuzzi Whirlpool BathP.O. Drawer JWalnut Creek, CA 94596-9885WARRANTY COVERAGEJacuzzi Whirlpool Bath (the “Company”) offers the following express lim
RESPONSIBILITIES OF OTHERSInspecting the unit prior to installation is the responsibility of the installer or building contractor who acts on behalf o
Important: Read complete instructions before beginning installation.Each unit arrives ready for installation, equipped with base, glass and associate
32 WALL ROUGH-IN REFERENCE60"42-5/16"33-3/4"27-15/16"84"23"21-1/2"FRONT VIEWTOP VIEW1/2" RIGIDCOPPER PIPEUNDER
2 WALL COMPONENT IDENTIFICATION4HEX WRENCH (1)(PROVIDED)STRAIGHTGLASSWALLMOUNTINGPOSTSTRAIGHTGLASSPANELMOUNTINGPOSTCAP (2)3 SCREWS AND3 WALL ANCHORSPE
5PRELIMINARY ROUGH-INSPREAD MORTAR OR LEVELING COMPOUND ETC.EVENLY OVER ENTIRE AREASTRAINERDRAINASSEMBLYSILICONESEALANTSHOWER BASERUBBER WASHERFIBER W
6TIGHTEN SEALING NUTTOOL(INCLUDED)GAPTILEFLANGEINCORRECTSHIMSTUDCORRECTTILEFLANGESTUDUSESCREWS(PROVIDED)USESCREWS(PROVIDED)STEP 5With a large screwdri
72 WALL BASE INSTALLATIONSTUDCEMENT BOARD1/4" MINIMUM GAPSILICONESEALANTTILETILEADHESIVE1/4" MINIMUMGAPSILICONESEALANTSTUDCEMENTBOARD1/8&quo
Comments to this Manuals